Cabling Archives - GST - Golden Star Technology https://gstinc.com/category/case-study/cabling/ IT & AV Solutions for a Connected World Since 1985 Sat, 21 Dec 2024 00:28:56 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.2 SoCal Premier Healthcare Facility https://gstinc.com/healthcare-facility/ Mon, 09 Dec 2024 20:03:04 +0000 https://gstinc.com/?p=4021 CHALLENGE: Transforming a chaotic and unstructured cabling system into a streamlined, efficient, and reliable network infrastructure without disrupting critical operations

The post SoCal Premier Healthcare Facility appeared first on GST - Golden Star Technology.

]]>

GALLERY

PROJECT SUMMARY

Golden Star Technology (GST) called in to reorganize and optimize Intermediate Distribution Frame (IDF) cable management for a premier healthcare facility in Southern California . The goal was to improve network infrastructure organization by repatching, re-dressing, and optimizing the use of patch panels and switches.

Key Tasks Included: 

  • Port Mapping: Created detailed port maps linking the switches and patch panels to facilitate seamless re-cabling.
  • Cable Management: Unplugged and systematically replaced existing cables. Repatched and dressed cables according to the new port maps, using hospital-supplied materials.
  • Testing and Validation: Collaborated with the customer’s IT team to verify network connectivity after completing each IDF setup.

The GST team successfully completed the project, delivering a well-organized IDF setup that met the facility’s expectations for functionality and maintainability. By using a fixed price service model, the project was completed within budget, emphasizing cost predictability and customer satisfaction.

QUICK FACTS

ORGANIZATION SIZE:

Not-for-profit Regional Health Care Facility

8,000 staff members

1,800 physicians

INDUSTRY: 

Healthcare

VENDORS INVOLVED:

Unirise

CHALLENGE

The project faced the challenge of reorganizing disorganized IDF cabling to improve network reliability and scalability while ensuring minimal disruption to critical operations. This required careful planning, precision, and collaboration with the client’s IT team to maintain uninterrupted connectivity throughout the process.

The post SoCal Premier Healthcare Facility appeared first on GST - Golden Star Technology.

]]>
Lynwood Unified School District https://gstinc.com/lynwood-unified-school-district/ Wed, 20 May 2020 23:22:01 +0000 http://gstes.com/index.php/2020/05/20/technology-and-music-copy-copy/ CHALLENGE: Lynwood USD reached out to GST with an immediate target deadline for a fiber install project. Lynwood USD sought to run fiber optics within the District office and seven other Elementary schools...

The post Lynwood Unified School District appeared first on GST - Golden Star Technology.

]]>

PROJECT SUMMARY

GST Team successfully located the correct paths to run fiber at several Elementary schools.

  • Developed new cabling standard drawings
  • Locate and map paths
  • Fiber pull length estimation
  • Installed fiber optic cabling

QUICK FACTS

ORGANIZATION SIZE:

201-500 employees

INDUSTRY:

K-12

VENDORS INVOLVED:

Aerohive

CHALLENGE

Lynwood USD reached out to GST with an immediate target deadline for a fiber install project. Lynwood USD sought to run fiber optics within the District office and seven other Elementary schools. The District found themselves in a tricky situation, there were no records of any drawings on how the paths lead, to run fiber optics.

The GST engineers had to quickly plan and deliver new drawings with a solid migration and refresh plan that could be executed with confidence to meet the client’s target deadline.

The post Lynwood Unified School District appeared first on GST - Golden Star Technology.

]]>
City of Placentia https://gstinc.com/city-of-placentia/ Mon, 19 Mar 2018 22:22:14 +0000 http://gstes.com/index.php/2020/06/19/santa-monica-public-library-copy/ CHALLENGE: The City of Placentia’s City Hall needed to update their outdated computer network.

The post City of Placentia appeared first on GST - Golden Star Technology.

]]>

PROJECT SUMMARY

The GST Team proposed to provide, install and configure the following:

  • Install Paging DSP
  • Paging Station

The customer will achieve its objective of having a durable, easy-to-use paging system. GST will also provide complete system training.

BeforeAfter

QUICK FACTS

ORGANIZATION SIZE:

201-500 employees

INDUSTRY:

Local Government

VENDORS INVOLVED:

Cisco

CHALLENGE

The City of Placentia’s City Hall needed to update their outdated computer network.

The post City of Placentia appeared first on GST - Golden Star Technology.

]]>
Royal Paper Box https://gstinc.com/royal-paper-box/ Mon, 19 Mar 2018 21:57:17 +0000 http://gstes.com/index.php/2020/06/19/lynwood-unified-school-district-copy/ CHALLENGE: After years of neglect, the customer needed cable management support and patching.

The post Royal Paper Box appeared first on GST - Golden Star Technology.

]]>

PROJECT SUMMARY

GST engineers performed the following services during non-business hours to minimize business impact:

  • Replaced patch cables
  • Labeled and re-directed cables
  • Cables were modified removing unnecessary length
  • Proper and industry standard cable management
  • Test and QC for connectivity

QUICK FACTS

ORGANIZATION SIZE:

201-500 employees

INDUSTRY:

Commercial

VENDORS INVOLVED:

GST Cable Management

CHALLENGE

After years of neglect, the customer needed cable management support and patching.

The post Royal Paper Box appeared first on GST - Golden Star Technology.

]]>